Subway networks were engineered for the climate that existed when they were dug. The water is now arriving on a different schedule, in different volumes, and coastal agencies are discovering that their century-old drainage assumptions are a maintenance backlog written in seawater.
The failure cascade in one sentence
A quarter-inch over the third rail trips power protection; tripped power stops trains; stopped trains strand riders on platforms; stranded riders open every exit gate at once; and the station manager discovers the street entrance is where the flood is actually heading.
What good preparation looks like
Flood doors at portal mouths and shaft vents. Pump stations sized for the next storm, not the last one. Portable barriers staged in the stations that failed first — because the map of past flooding predicts future flooding with embarrassing accuracy. And sensors in low points that text the control room before a person could walk there.
The equity of puddles
Deep-bored systems in dense old districts often have the least storm capacity because they have the least room to add any. The neighbourhoods that flood first are usually the ones that were promised the drainage upgrade years ago.

Climate-proofing is not a ribbon-cutting project; it is a decade of small unglamorous installs, each one bought by the last storm. Riders can watch for the boring signals of a serious agency: pumps running on dry days, drills logged and posted, barriers that match the flood map.